Shandong Hanchei Industrial Equipment Co.,Ltd

Installation of Double Mechanical Seal for glass lined Enamel Reactor


Installation of Double Mechanical Seal for glass lined Enamel Reactor

The installation principle of double mechanical seal for enamel reactor is the same as that of single end mechanical seal for glass lining reactor. The glass lining mechanical seal is installed after the glass lining agitator is installed. It is connected and fixed with the flange of the stirring hole looper and assembled with the mechanical seal section of the agitator. Adjust the relative positions of the frame, stirrer, mechanical seal and tank body of the transmission device according to the principle of "three levels, two centers and one vertical" during installation. Three levels: tank body level, transmission level, mechanical seal level. The two centers are: the stirring shaft is in the center of the static ring of the mechanical seal, and also in the center of the stirring hole of the tank cover. Vertical: mixing shaft and mechanical seal static ring face vertical. The installation of double-end mechanical seal for enamel reactor can be divided into the following four stages:

A. Equipment stage before installation of double-end mechanical seal for enamel reactor:
(1) Open the packing box of the machine and carefully check whether the glass enamel surface of the machine is in good condition;
(2) The enamel reactor tank body is adjusted and fixed horizontally, and a soft cushion is laid at the bottom of the reactor to protect the glass lined surface;
(3) carefully check whether the agitator of the enamel reactor is damaged;
(4) glass lining mixing lifting, lifting process should be careful, pay attention to protection, prevent bumping;
⑤ Put the glass lining mixing crane in the center of the bottom of the reactor;
(6) with fine sandpaper will stir the shaft head polished clean, and according to the requirements of the tank medium use of lubricating oil coated in a little amount at the shaft head, easy to machine seal lubrication installation;
⑦ Wipe the glass lining surface of the tank body kettle mouth with clean cotton cloth with diluent;
(8) remove the plastic packaging on the outer surface of the large gasket at the kettle mouth of the tank body, and wind it with the tetrafluoron belt, and place the wrapped gasket flat on the kettle mouth;
⑨ Clean the glass lining surface of the mixing hole of the flat cover;
⑩ Wrap the gasket at the mixing hole of the tank flat cover with the ptfe tape, and place the wrapped gasket flat on the nozzle;
11. Lift the tank flat cover into place and slowly fall down to make the stirring shaft extend slowly from the center of the stirring hole on the tank cover;
12, with a soft cloth evenly inserted into the mixing shaft and mixing hole gap, to prevent the tank cover lifting tube mouth and mixing collision wear;
13. Evenly distribute all clips configured in the reaction kettle and tighten diagonally;

B. Installation stage of mechanical seal reducer of enamel reactor:
1. Slowly insert the mechanical seal into the stirring shaft head;
2, adjust the mechanical seal to align with the bolt hole of the flat cover bearing;
3. Install screws but don't fix them tightly;
4. First separate the reducer from the bracket;
5. Lift the reducer support;
6. Adjust the direction of the support to make the oil inlet and outlet of the mechanical seal face the opening of the support;
7. Lift the bracket in place, install bolts, and fix the bracket with diagonal fastening bolts;
8. Put the stirring anti-delocking ring and anti-delocking nut cover on the middle plate of the support;
9. Install the stirring lifting bolt;
10, vertical slow lifting mixing (manual hoist is recommended);
11. Place the "key" of the mixing shaft in the key slot of the mixing shaft;
12, adjust the axis "key" orientation, continue to slowly lift the mixing in place;
13. After stirring and lifting in place, the loosening nut will be rotated and fixed and locked;
14. Place the "key" of mixing shaft head into the keyway of mixing shaft head;
15. Install coupling corresponding to the position of mixing shaft head key;
16, the corresponding coupling keyway lifting reducer;
17, the reducer and bracket bolts fixed and diagonal fastening;

C. Machine seal adjustment stage:
(1) Diagonal adjustment and fastening the bolt at the bottom of the machine seal, so that the gap between the machine seal inner ring and the mixing shaft is uniform;
(2) Manual turning test to ensure no collision and uniform gap between stirring shaft and sealing inner ring;
(3) open the fixed lock plate above the machine seal outward and lock it tightly;
④ In order to ensure the sealing effect, press the mechanical seal shaft sleeve 1~2mm;
(5) Tighten all the bolts around the upper part of the machine sealing sleeve diagonally;

D, the installation of sealing accessories and casing:
(1) in the reducer support side installation of pressure balance tank;
(2) Install inlet pipe and outlet pipe according to the pipe mark on the machine seal;
(3) Add no. 46 oil to the balance tank, add to 3/4;
(4) if the pressure in the kettle is greater than 4MPa, the pressure in the balance tank needs to be greater than 1.5mpa in the kettle;
⑤ If the pressure in the kettle is less than 4MPa, the balance tank does not need to press;
⑥ Carefully clean and check whether the casing is damaged; Hoisting the casing;
(7) Install the thermowell pocket;
(8) put the ptfe gasket on the casing mouth of the tank cover;
⑨ Put the casing into the kettle slowly by punching the nozzle;
⑩ Fix the bushing with looper flange bolts; 11. When the motor is connected, the point-motion test mode is adopted first to ensure that the mixing rotates clockwise, and then the power transmission test operation is carried out;

Contact Us

    Name: Mia

    Tel: +86-17306387060

    Mobile/Whatsapp: +86-17306387060

    E-mail: [email protected]

    WeChat: +86-17306387060

    Whatsapp: +86-17306387060

    Add: No.7 Zhangdian High-tech zone, Zibo City of Shandong province, China

    facebook: https://www.facebook.com/hancheichemicalequipment facebook: https://twitter.com/ivan_h777 sales02@hanchei.com